Montana State University - Facilities Condition Inventory
Deficiency Detail by Building
Area Correction:
Gross Area:
Site: Great Falls College MSU
Building: TRADES BUILDING
Cost/Sq Ft:
$220.93 Replacement Cost:
$2,738,109 Building Type/ Vocational Shops (6C)
Age Class:
Const. Date: 2008
Entry # Component
Initial Entry
Last Def. Def
Update Cat. %
System: Envelope (2)
5832 Exterior Walls (A)
7725 Wall Finishes (E)
8440 Heating (A)
7729 Supply Piping (B)
7727 Waste Piping (C)
$8,774 $8,774
Totals: $5,831
06-12-2019 06-12-2019
2 5%
06-12-2019 06-12-2019
2 5%
02-24-2021 02-24-2021
2 Totals:
$6,786 06-12-2019 06-12-2019
06-12-2019 06-12-2019
2 2
5% 5%
06-12-2019 03-15-2021
5 1%
System: Electrical System (9)
7724 Building Service (A)
3/15/2021 1.4%
$371,046 Totals:
System: Plumbing System (8)
Deficiency Ratio:
System Replace
Cost Description
5% $14.16
System: HVAC System (7)
3/15/2021 $39,025
Comp. Renew
Cost 2
System: Finishes (5)
Last Audit Date:
Report Renewal Cost:
Unit Cost
06-10-2015 06-10-2015
System: Roof System (4)
7730 Covering (B)
1.21 12,393 Sq Ft
$9.41 $5,831
Totals: $3,984
$6.43 $3,984
Totals: $13,521
10% $10.91
$13,521 $4.10
$6.85 $2,541
$4,245 Totals:
$129 $1.04
Def. Categories
1 2
3 4
5 6
7 South exterior wall - investigate movement of wall slab on grade.

$216,878 Rubber membrane roof covering EUL - patched in 2018. Add
insulation replacements concurrent to roof covering.

$258,642 Prep and paint wall finishes as needed.

$270,415 1 Carrier rooftop ERU EUL (Installed 2007) with a 25 year
lifespan. $162,596
Supply piping EUL.

Waste piping EUL
$229,394 $129
Upgrade lighting to LED in bathrooms and room T314 (Complted
8/20). Deficiency Detail by Building
FCI Version: 1.1.9
Deficiency Categories 1-6
Page 5 of 5
Deficiency Categories: 1: Safety, 2: Damage/Wearout, 3: Codes/Standards, 4: Environmental Improvements, 5: Energy Conservation, 6: Aesthetics, 7: Building Enhancements
Facilities Master Plan 2023–2028
5